You are running an unsupported browser, please upgrade your browser. Close

Case Study: Aria FIT Packaged Systems – City of Cisco, TX

The City of Cisco, TX upgraded their municipal water treatment plant with Pall Water's Aria FIT Packaged Water skids, featuring trusted membrane technology.

Case Study: City of Cisco, TX

Municipal Water Treatment – Drinking Water | North America: Cisco, Texas, USA

 

In 2010, the City of Cisco, Texas decided to upgrade its existing water treatment plant, seeking to replace its conventional dual media filters with modern, sophisticated membrane technology. The City of Cisco’s water treatment plant serves more than 6,500 residents, which includes two wholesale customers that purchase bulk water from the city for surrounding rural communities. Ultimately, Pall Water's Aria FIT packaged water treatment was selected after performing strongly during the pilot testing phase. 

 

Continue reading below for more informaiton. Scroll down for a free download of the full case study... 

Solution Overview

  • Quality Water: Plant meets regulations and complies with turbidity removal
  • Flexible Capacity: Three skids with 2.5 MGD total capacity
  • Easy-to-Operate Controls: Simple to understand and operate 
  • Automatic Data Logging & Reporting: System includes streamlined reporting for operators

Download Case Study:

Learn more about this municipal water treatment solution, download our FREE case study today to read the complete project story.
Learn more about this municipal water treatment solution, download our FREE case study today to read the complete project story.
Read more

Complete the form below to download our case study!

 

Packaged Water Solutions:

"Streamlining Operator Use and Regulatory Compliance with Automated Membrane Filtration System"
"Streamlining Operator Use and Regulatory Compliance with Automated Membrane Filtration System"
Read more
  • The Challenge

    When the City of Cisco, Texas decided to upgrade its existing water treatment plant, it sought to replace its conventional dual media filters with modern, sophisticated membrane technology. In order to determine which membrane system to implement, officials began qualifying solutions from a variety of vendors.

  • The Solution

    The quality and reliability of Pall Water’s system was evident throughout the pilot, resulting in the selection of Pall’s Aria FIT membrane filtration system. The City of Cisco’s water treatment plant implemented three skids, resulting in a total capacity of 2.5 million gallons per day (MGD).

  • The Results

    The high performing membrane skids provide quality water while the system remains easy-to-operate. Furthermore, the fully integrated membrane system has automated data logging, making it much easier for the plant to comply with regulations.

  • Packaged Water: Aria FIT

    Pall Water's Aria FIT packaged water treatment solution produces high-quality drinking water in an easy-to-operate system. Learn more about our packaged water systems today!

    Learn More »

Learn More About the City of Cisco's Municipal Water Upgrade

An automated control system and membrane water treatment skids provide operators with high-quality drinking water

Packaged Water Solutions: Aria™ FIT – MF / UF Systems

Fits your schedule, your footprint, and your budget

These easy-to-operate, pre-engineered systems incorporate proven, plug-and-play designs that can be installed quickly into new or pre-existing plants. 

Pretreatment Solutions: Filters & Housings

Smart water solutions to protect what matters

Shop our wide range of consumable filters and housings today. Pall Water's pretreatment solutions perfectly accompany existing Pall systems. Discover how effective filtration can protect your membranes, your systems, and your investments.