Case Study: City of Cisco, TX
Municipal Water Treatment – Drinking Water | North America: Cisco, Texas, USA
In 2010, the City of Cisco, Texas decided to upgrade its existing water treatment plant, seeking to replace its conventional dual media filters with modern, sophisticated membrane technology. The City of Cisco’s water treatment plant serves more than 6,500 residents, which includes two wholesale customers that purchase bulk water from the city for surrounding rural communities. Ultimately, Pall Water's Aria FIT packaged water treatment was selected after performing strongly during the pilot testing phase.
Continue reading below for more informaiton. Scroll down for a free download of the full case study...
Solution Overview
- Quality Water: Plant meets regulations and complies with turbidity removal
- Flexible Capacity: Three skids with 2.5 MGD total capacity
- Easy-to-Operate Controls: Simple to understand and operate
- Automatic Data Logging & Reporting: System includes streamlined reporting for operators

Complete the form below to download our case study!
Thank You for Your Interest!
Thank you for your interest in downloading some of our materials. Please select the link below to access the information you requested.
- Click to Download: Aria FIT Cisco, TX Case Study
- Click to Download: Aria FIT Cisco, TX Case Study (Portuguese)
- Click to Download: Aria FIT Cisco, TX Case Study (Spanish)
-
The Challenge
When the City of Cisco, Texas decided to upgrade its existing water treatment plant, it sought to replace its conventional dual media filters with modern, sophisticated membrane technology. In order to determine which membrane system to implement, officials began qualifying solutions from a variety of vendors.
-
The Solution
The quality and reliability of Pall Water’s system was evident throughout the pilot, resulting in the selection of Pall’s Aria FIT membrane filtration system. The City of Cisco’s water treatment plant implemented three skids, resulting in a total capacity of 2.5 million gallons per day (MGD).
-
The Results
The high performing membrane skids provide quality water while the system remains easy-to-operate. Furthermore, the fully integrated membrane system has automated data logging, making it much easier for the plant to comply with regulations.
-
Packaged Water: Aria FIT
Pall Water's Aria FIT packaged water treatment solution produces high-quality drinking water in an easy-to-operate system. Learn more about our packaged water systems today!
Learn More »
More Case Studies
Interested in learning more about projects like this one? Check out our full Case Study Library for more information about our water treatment solutions.
In the News
In addition to reading our Case Studies, see where our projects have been mentioned in the news.
Learn More About the City of Cisco's Municipal Water Upgrade
An automated control system and membrane water treatment skids provide operators with high-quality drinking water

Packaged Water Solutions: Aria™ FIT – MF / UF Systems
Fits your schedule, your footprint, and your budget
These easy-to-operate, pre-engineered systems incorporate proven, plug-and-play designs that can be installed quickly into new or pre-existing plants.

Pretreatment Solutions: Filters & Housings
Smart water solutions to protect what matters
Shop our wide range of consumable filters and housings today. Pall Water's pretreatment solutions perfectly accompany existing Pall systems. Discover how effective filtration can protect your membranes, your systems, and your investments.
Contact Us
Questions? Looking for a solution? Contact Pall Water today for more information, and one of our water experts will get in touch shortly. We look forward to hearing from you!